Empower Your Energy Journey

The rising cost of electricity continues to challenge homeowners and businesses across Kenya. Many people are turning to solar energy as a reliable and sustainable solution. However, the true power of solar comes alive when paired with net metering.

At Texas Solutech, we guide clients every step of the way from system design to licensing. If you’ve ever wondered how to apply for net metering in Kenya, you’re in the right place. This article outlines the process in a clear and practical way, helping you start your solar journey with confidence.

What is Net Metering and Why Does It Matter?

Net metering allows you to send excess solar electricity back to the grid and earn credits on your electricity bill. When your solar panels produce more than you consume, the surplus flows to Kenya Power. You get paid in credits, which reduce your future bills.

This system ensures you make the most out of your solar investment. It promotes sustainability while helping you manage energy costs more effectively.

Understanding How to Apply for Net Metering in Kenya

The application process involves a few steps. It may look technical, but with the right guidance, it’s smooth and rewarding.

Let’s break down each stage of how to apply for net metering in Kenya in detail.

Step 1: Site Evaluation and System Design

Before submitting any application, you need a well-designed solar system. At Texas Solutech, we start by evaluating your property to determine your energy needs and solar potential.

We check:

  • Available rooftop or ground space
  • Daylight exposure and shading
  • Current electricity consumption
  • Load patterns

From this, we design a custom solar system that aligns with your usage and potential savings.

Step 2: Apply for a Generation License

Kenya’s net metering program is regulated by the Energy and Petroleum Regulatory Authority (EPRA). If your solar system exceeds 1MW, you’ll need a generation license. For smaller systems, you only require registration.

We help you prepare:

  • A detailed system design
  • Technical drawings
  • Load demand data
  • Environmental and safety reports

Once complete, we file the application to EPRA on your behalf.

Step 3: Sign a Net Metering Agreement with Kenya Power

With the system design approved, the next step is formalizing your connection with Kenya Power. This involves signing a net metering agreement.

You will need to submit:

  • A copy of the system approval from EPRA
  • System commissioning report
  • Identity documents (for residential systems)
  • Business registration (for commercial users)

Kenya Power will then schedule a site inspection to verify that your solar system is safely installed and grid-ready.

Step 4: Meter Upgrade and Grid Synchronization

For net metering to work, Kenya Power must install a bidirectional meter. This device records both energy consumed from the grid and energy exported to the grid.

Texas Solutech coordinates this process and ensures proper configuration. Once installed, you are officially enrolled in the net metering program.

This marks the beginning of your energy savings journey.

Step 5: System Monitoring and Maintenance

Net metering works best when your system performs at its peak. After the system goes live, we help monitor energy output and consumption. We also schedule periodic checks to ensure your panels, inverters, and meters operate at full capacity.

With proper care, your system can serve you for over 20 years—delivering both clean energy and consistent savings.

Why Choose Texas Solutech for Your Net Metering Setup

At Texas Solutech, we believe in doing more than just installing solar panels. We walk with you from consultation to grid connection.

Here’s what makes us a trusted solar partner:

  • Certified solar experts with years of hands-on experience
  • In-house licensing team that handles all EPRA and Kenya Power documentation
  • Custom solar designs tailored to your home or business
  • Affordable and flexible financing for solar projects
  • Dedicated after-sales service and performance tracking

We simplify every part of the journey from understanding how to apply for net metering in Kenya to maximizing long-term savings.

Frequently Asked Questions

How long does it take to get approved?

The net metering application process can take between 30–60 days, depending on documentation and inspections. With Texas Solutech, the process moves faster because we handle the paperwork and follow-ups.

What’s the cost of applying for net metering?

Application and licensing costs vary based on system size. We offer free consultations to help you estimate the total cost upfront.

Can homes and businesses apply?

Yes. Both residential and commercial properties can benefit from net metering. We help all clients, from single homes to large factories.

Start Saving with Solar Today

Understanding how to apply for net metering in Kenya opens the door to lower bills and greener living. With the right team, you don’t have to worry about red tape or technical jargon.

At Texas Solutech, we make solar simple. Our team is here to walk with you step by step toward a cleaner, more affordable future.