Blue Nile Rolling Mills — 1.685 MWp solar

1.685 MWp generation-licence review and approval support for a steel-mill operator.

For Blue Nile Rolling Mills, Texas Solutech delivered inspection, design correction, Engineer's reports and licence-application support for a 1.685 MWp captive solar installation. The IPP licence was approved, enabling the energy-intensive steel-rolling operation to displace a significant share of grid imports.

Blue Nile Rolling Mills — 1.685 MWp solar

The Challenge

Steel-rolling mills are energy-intensive; the client wanted captive solar generation with a defensible licence application.

Our Solution

Inspection, design correction, Engineer's report and licence-application support for the 1.685 MWp installation.

The Outcome

IPP licence approved, enabling significant on-site generation capacity.