Megapack — 320 kWp grid-tied solar PV

320 kWp grid-tied solar PV installation, part of a 970 kWp portfolio across the Megapack group.

Texas Solutech engineered and installed Megapack's 320 kWp grid-tied solar PV system — the first phase of a 970 kWp portfolio across the group. The installation immediately reduced daytime grid demand, with a monitoring dashboard guiding the subsequent phases.

Megapack — 320 kWp grid-tied solar PV

The Challenge

Megapack required a phased rollout of captive solar generation across its packaging operations.

Our Solution

Engineered and installed a 320 kWp grid-tied PV system as the first phase of a 970 kWp portfolio.

The Outcome

Lower daytime grid demand, with a monitoring dashboard guiding the next phases.