EPRA — Energy & Petroleum Regulatory Authority
Kenya's national energy regulator, responsible for licensing and standards across electricity, petroleum and renewable energy.
Eldoret serves north-Rift agriculture, tea factories and a growing industrial base. Our portfolio in the corridor includes the Koisagat Tea Factory 100 kW grid-tied solar plant and NKCC Sotik's 501 kWp installation.
We construct low- and medium-voltage powerlines, substations and distribution networks for utilities, developers and industrial clients across East Africa. From route survey and wayleave coordination to pole erection, stringing and energisation — every kilometre is built to utility-grade and IEC standards under disciplined HSE management.
Built to national and international standards.
Survey, supply, build and energise.
Rigorous HSE on every site.
Disciplined project management.
Route survey, loading and design.
Approvals and quality procurement.
Pole erection, stringing and fittings.
Testing, commissioning and handover.
Kenya's national energy regulator, responsible for licensing and standards across electricity, petroleum and renewable energy.
High-altitude location boosts solar yields; the regional grid is generally stable but tariff-sensitive industrial sites benefit from captive PV.
Project case studies in Eldoret are listed below — real client work, not stock examples.
Real Texas Solutech work in Eldoret — drawn from the case studies on our Projects page.
Yes, we manage route surveys and wayleave coordination as part of turnkey delivery.
Texas Solutech delivers Powerline Construction across Kenya and the wider East African region. Pick the country or city closest to your site:
Texas Solutech engineers deploy across Kenya with calibrated test gear and EPRA-aligned reporting.