EPRA — Energy & Petroleum Regulatory Authority
Kenya's national energy regulator, responsible for licensing and standards across electricity, petroleum and renewable energy.
Nairobi is home to our head office and the largest cluster of our engineering work — from Equity Bank's branch audits and IX Africa's hyperscale data centre commissioning to BAT's Likoni Road solar EPC and ATEX training at Suman Shakti and United Aray. We deploy crews same-day across the metropolitan area.
Texas Solutech designs, supplies and installs grid-tied, off-grid and hybrid solar power plants for industrial, commercial and institutional clients across East Africa. Our engineers handle feasibility, yield modelling, structural and electrical design, procurement, installation, commissioning and long-term monitoring — built to international standards with tier-1 components.
Cut grid dependence and slash operating costs from day one.
Detailed yield modelling and ROI analysis you can finance against.
Real-time performance dashboards and proactive fault alerts.
Tier-1 panels and inverters with robust mounting and warranties.
Energy audit, shading study and structural survey.
PV layout, single-line diagrams and yield simulation.
Quality components, certified installation and testing.
Grid synchronisation, handover and ongoing O&M.
Kenya's national energy regulator, responsible for licensing and standards across electricity, petroleum and renewable energy.
Moderate altitude tempers solar yields (still ≈ 1,800 kWh/kWp) and a tariff-sensitive Kenya Power grid makes captive solar a high-ROI investment for industrial sites.
Project case studies in Nairobi are listed below — real client work, not stock examples.
Real Texas Solutech work in Nairobi — drawn from the case studies on our Projects page.
Our Nairobi portfolio includes BAT Likoni Road (300 kWp), Megapack group sites (970 kWp) and 50+ Total Energy forecourt installations.
It depends on your load profile, grid reliability and budget. We model both options during the feasibility stage and recommend the best fit.
Commercial rooftops typically take 2–6 weeks; larger ground-mount plants are scheduled around your operations.
Texas Solutech delivers Solar Power Plant across Kenya and the wider East African region. Pick the country or city closest to your site:
Texas Solutech engineers deploy across Kenya with calibrated test gear and EPRA-aligned reporting.