ERC — Electricity Regulatory Council
South Sudan's electricity sector regulator, overseeing licensing and grid standards.
Our work in South Sudan includes design verification, testing and commissioning for the World Bank headquarters project in Juba and ATEX electrical inspections at the Palouch oil drilling rig.
Texas Solutech designs, supplies and installs grid-tied, off-grid and hybrid solar power plants for industrial, commercial and institutional clients across East Africa. Our engineers handle feasibility, yield modelling, structural and electrical design, procurement, installation, commissioning and long-term monitoring — built to international standards with tier-1 components.
Cut grid dependence and slash operating costs from day one.
Detailed yield modelling and ROI analysis you can finance against.
Real-time performance dashboards and proactive fault alerts.
Tier-1 panels and inverters with robust mounting and warranties.
Energy audit, shading study and structural survey.
PV layout, single-line diagrams and yield simulation.
Quality components, certified installation and testing.
Grid synchronisation, handover and ongoing O&M.
South Sudan's electricity sector regulator, overseeing licensing and grid standards.
Limited national grid coverage means most facilities rely on captive generation; mining and oil-drilling operations need ATEX/Ex-certified electrical safety from day one.
Project case studies in South Sudan are listed below — real client work, not stock examples.
Real Texas Solutech work in South Sudan — drawn from the case studies on our Projects page.
It depends on your load profile, grid reliability and budget. We model both options during the feasibility stage and recommend the best fit.
Commercial rooftops typically take 2–6 weeks; larger ground-mount plants are scheduled around your operations.
Texas Solutech engineers deploy across South Sudan with calibrated test gear and ERC-aligned reporting.